The schedule of rates module (SOR) allows the user to
attach monetary values to measured term contract work orders that have
been raised on a building or asset. These monetary values are derived from
a National Schedule of Rates Table (NSOR), which can be imported into
IMPACTxp using the generic interface module.
The NSOR table lists all tasks that can be hypothetically undertaken by
contractors, including the total cost split by standard hours, labor rate
and materials. The user has the flexibility to change any aspect of the
table or even add further rates.
The IMPACTxp system then allows the user to apply percentage variances
according to customer location or apply trade percentage deviations to
chosen sections of the NSOR.
The flexibility of this module means that it can be utilized by the
contractor to issue quotations, or by the customer to issue work orders to
on site contractors. The benefits of utilizing this module include:
Standardization
of charge rates
Unique
knowledge of cost prior to the completion of work
On-site
contractors are prevented from overcharging
flexible rate file
The national schedule of rates data can be electronically imported into
IMPACTxp and periodically updated using the generic
interface module. This means that the user does not have spend time
setting up the rate file.
The data is broken down into sections and subsections to arrive at a
unique measured term contract code (rate), for example:
Section A
– contractors general cost
Section
A20 – temporary works
Heading
A2013 – erect tower scaffold
MTC code –
A201315
The MTC code represents a cost for the work to be carried out, split by
labor; materials and plant hire and can be viewed against the code. The
user also has the opportunity to add instructions for carrying out the
task. This means that not only can the cost be standardized – the quality
of the work can be too. The IMPACTxp system offers the maximum flexibility
by allowing the user to change or even extend the rate file.
dynamic contract maintenance
All contracts are recorded within IMPACTxp. The user is able to log the
contract number, order number, renewal date and other sundry information.
(The user can run a report to ascertain a list of those contracts nearing
their renewal date).
The user can also attach tax codes, cost codes, zones and trade
variations. By attaching a zone, the user can apply percentage variances
(uplift or discount) to the standard SOR according to the location of the
buildings within the contract. A trade variance option also allows the
user to apply percentage variations to selected sub sections of the SOR by
contract. This means that the user can standardize the cost of work by
individual contract with the minimum of fuss.
mtc work orders
An MTC order is created in the same way as any other IMPACTxp work order.
The user first selects the relevant building from a drop down list and
details the priority of the work, the department and the print format for
the order.
A unique feature of the IMPACTxp system means that the user can drill down
to the work order history, current work orders, minor defects and
help desk requests (if help desk is licensed) for
that particular building. When the work order information is completed,
the user simply clicks on a highlighted button to access a new screen,
where the rates and the contract details are determined.
The system is automatically able to locate the contract for the selected
building. However the user can override this if necessary. Each section of
the rate schedule is then selected from drop down lists and the MTC code
is determined.
When the MTC code is selected, the system automatically displays the cost
of the work for labor, materials and plant hire. The user has the ability
however to change any or all of these fields.
The user is also able to specify if the work order incurs a call out fee
or if the cost of the work can be reclaimed (for example vandalism). The
system then works out a total cost for the work to be carried out taking
into account trade variations and zones. The work order is then completed.
The user is able to select multiple MTC codes for every work order.
work order validation
The status of work orders can be automatically changed throughout the work
order validation process. When the contractor completes the work order,
time is logged and the status is changed. The work order can then be
passed to a supervisor for validation that there is a match between the
raised order value and what the contractor has charged for the work. When
this is validated, the status is changed again and the work order can be
costed and archived. It cannot be passed for payment until the relevant
supervisor has changed the status. This ensures that the contractor is
unable to overcharge.
|
|
|
| |
Click below to visit find out more about
our rapid web development toolset, FastNET ASP
www.fastnetasp.net |
|
|

Click here
to find out
more about our latest browser based maintenance management system. |
|
|
|